Recherchiere Firmen­bekanntmachungen und finanzielle Kennzahlen

EU-Förderung (3.999.639 €): HIghly fortschrittliches probabilistisches Design und verbesserte Zuverlässigkeitsmethoden für hochwertige, kosteneffiziente Offshore-WIND Hor01.12.2020 EU-Rahmenprogramm für Forschung und Innovation "Horizont"

Auf einen Blick

Text

HIghly fortschrittliches probabilistisches Design und verbesserte Zuverlässigkeitsmethoden für hochwertige, kosteneffiziente Offshore-WIND

The core challenge addressed in this project is the advancement of the entire modelling chain spanning basic atmospheric physics to advanced engineering design in order to lower uncertainty and risk for large offshore wind farms. The five specific objectives of the HIPERWIND project are to: 1) improve the accuracy and spatial resolution of met-ocean models; 2) develop novel load assessment methods tailored to the dynamics of large offshore fixed bottom and floating wind turbines; 3) develop an efficient reliability computation framework; 4) develop and validate the modelling framework for degradation of offshore wind turbine components due to loads and environment; and 5) prioritize concrete, quantified measures that result in LCOE reduction of at least 9% and market value improvement of 1% for offshore wind energy. The requirements for advanced modelling and development of basic scientific solutions necessitates the strong involvement from academic partners (DTU, ETH, and UiB) and research organizations (IFPEN, DNVGL, and ????) and potential end users (EDF) to supply relevant operational data for model validation, provide access to cutting edge industrial environment and to open up exploitation pathways beyond TRL5 toward eventual commercialisation. HIPERWIND employs multi-scale atmospheric flow and ocean modelling, creating a seamless connection between models of phenomena on mesoscale level and those on wind farm level, with the aim of reducing uncertainty in load predictions, and broadening the range of scenarios for which adequate load predictions are possible. Improved modelling of environmental conditions, improved load predictions, better reliability assessment and lower uncertainty, cost efficient design and operating strategies, and lower O&M costs will yield a projected 9% decrease in the Levelized Cost of Energy (LCOE) and 1% increase in the market value of offshore wind by the conclusion of the project.


Geförderte Unternehmen:

Firmenname Förderungssumme
DNV AS 357.625 €
Danmarks Tekniske Universitet 1.035.875 €
EDF Energy R&D UK Centre Ltd. 0,00 €
EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZUERICH 406.125 €
???? ?????? ??? 288.125 €
???????? ????? ???????? ????????? ???? 0,00 €
Electricite de France 912.338 €
IFP Energies Nouvelles 560.051 €
Universitetet I Bergen 439.500 €

Quelle: https://cordis.europa.eu/project/id/101006689

Diese Bekanntmachung wurde von Englisch nach Deutsch übersetzt. Die Bekanntmachung bezieht sich auf einen vergangenen Zeitpunkt, und spiegelt nicht notwendigerweise den heutigen Stand wider.

Creative Commons Lizenzvertrag Die Visualisierungen zu "DNV AS - EU-Förderung (3.999.639 €): HIghly fortschrittliches probabilistisches Design und verbesserte Zuverlässigkeitsmethoden für hochwertige, kosteneffiziente Offshore-WIND" werden von North Data zur Weiterverwendung unter einer Creative Commons Lizenz zur Verfügung gestellt.